Installation Steps of Offshore Conductors by Jetting Method
#### 1. Pre – installation Preparations – **Assemble the conductors**: Attach a jetting head to the bottom and connect a swivel joint to the top. – **Commission the mud pump**: Prepare high – viscosity drilling fluid. – **Position the platform**: Use Differential Global Positioning System (DGPS) for platform positioning and survey the seabed soil (which […]
Installation Steps of Offshore Conductors by Jetting Method Leer más »